Customizable Heavy Duty Steel Pallet Shuttle Rack for Warehouse Storage Cargo & Storage Equipment OEM/ODM

Product Description

Jracking Warehouse Solutions

Product Parameter

Radio Shuttle System Parameter

Radio Shuttle System

Jracking Shuttle Racking System is a high-density storage system. The shuttle cart, which is controlled by a wireless remote, takes the pallets in and out of the racking system. The forklift doesn't need to enter the storage area. The first pallet's location at either end is where the forklift loads and unloads the goods.

Name Radio shuttle system Material Q235a
Size Customized Size Color Customized
Depth Customized Weight Capacity 500~5000kg
Width Customized Height Customized
Finish Powder Coated
Usage Warehouse Storage System
Packing Customers' Request
Certification AS4084-2012 / CE / ISO / RMI
Free Sample Available (Delivery Cost on Buyer)
OEM Available

Product Introduction

Product Overview
Shuttle Racking Detail 1
Shuttle Racking Detail 2
Shuttle Racking Detail 3
Technical Characteristic
Specification Standard Type Low Temperature Type Advanced Type
Running Speed Vmax_empty: 1.2m/s
Vmax_full: 0.8m/s
Vmax_empty: 1.0m/s
Vmax_full: 0.8m/s
Vmax_empty: 1.5m/s
Vmax_full: 1.0m/s
Speed Standard The Highest in China The Highest in the world
Loading 1.5T (Heavy Load Type 2T) Leading in China
Operating Efficiency Closed-loop control of servo system is adopted to reach faster speed, which is 1.5~2 times faster than that in other counterparts.
Rapidity & Stability Motion parameter and curve of equipment are configured to realize both rapidity and stability.

Direction for Use

  • The shuttle has a high precision of parts that move along the aisles between shelves according to computer instructions.
  • The forklift doesn't need to enter the storage area. The first pallet's location at either end is where the forklift loads and unloads the goods.
  • The system could achieve both FIFO (First In First Out) and FILO (First In Last Out) modes.

Description of Application Effect

  • Can make full use of up to 90% of the total storage area.
  • Can store with both Last In First Out (LIFO) and First In First Out (FIFO) systems.
  • Reduce crashes between forklift and rack, resulting in decreased incidents and maintenance costs.
  • Can reach up to 40 meters deep storage channels.
Application Operation
Warehouse Storage Demonstration

Installation, Maintenance & Repair

Installation

Jracking will provide detailed installation drawings and an on-site installation guide for your project. A professional technician will adjust and test the shuttle cart for at least one week to ensure the shuttle racking system works properly.

Maintenance

Regular maintenance shall be executed in accordance with the application manual and maintenance instructions. Jracking's technician will train the responsible person in your warehouse on how to conduct routine maintenance. Lifelong maintenance is provided to protect customer interests. Jracking provides lifelong paid services beyond the warranty period. Spare parts for the racking or shuttle cart are supplied at the most favorable prices.

Repair

A one-year warranty is guaranteed by Jracking following successful installation and commissioning (excluding natural disasters and human-induced damage). Jracking's technician will train your team on basic troubleshooting and handling procedures. For complex situations, our technicians are dispatched to resolve issues on site.

We appreciate your trust in Jracking and our products. Please keep us posted if you have any suggestions or specific requirements.

Product Categories

Product Categories Overview

Company Profile

Company Introduction
Factory Facility
Manufacturing Capacity

Certifications

Certificates AS4084 CE ISO RMI

Production Process

Production Workflow

Frequently Asked Questions

Q: What are your trading terms and payment conditions?
1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A are also available.
2) Lead time: Normally 20-25 days after deposit received.
3) Sample policy: Samples are available for each model, prepared in 7-15 days once payment is received.
4) Shipping port: Shanghai / Nanjing, China.
5) Discounts: Available for volume and large quantity orders.
Q: How can I arrange delivery for my goods?
1) Sea freight: Freight rates are updated as soon as the destination seaport is confirmed.
2) Freight forwarder designated by client: Simply provide the forwarder's contact details, and our logistics team will coordinate the shipment directly.
Q: What services and support do you provide?
1) Inquiries related to products or pricing are answered within 12 hours.
2) Fluent English-speaking, well-trained staff are available for support.
3) Full OEM & ODM services to engineer customized storage racking configurations.
4) Experienced engineering specialists to provide optimal warehouse layouts.
Q: What is the standard ordering and purchasing process?
Design drawing → Confirm drawing → Quotation → Proforma Invoice (PI) → Confirm PI → Arrange 30% deposit → Manufacture → QC inspection → Pay balance → Shipping.
Q: What advantages make your system stand out?
1) Payment: Flexible O/A payment terms within 40-60 days.
2) Lead time: Fast-track options available for urgent orders.
3) Pricing: Highly competitive factory-direct supply rates.
4) Warranty: Two-year coverage with replacement components dispatched directly.
Q: Does Jracking have an MOQ limitation or mold fee policy?
There is no strict MOQ limitation; however, we recommend standard orders fit at least one 20ft container (~15 tons) for optimal shipping cost efficiency. For custom mold requirements, the upfront tooling cost is paid before opening the mold and is partially or fully refunded once orders reach a designated volume threshold.
Contact Jracking Racking Solutions

Related Products