Strong Load Capacity Durable Steel Structure Platform Pallet Rack Supported Mezzanine Floor Platform can be one-floor or multi-floors according to the requirements from customers. They can be built over existing equipment and work areas, making maximum use of warehouse height.
Stairs, hydraulic lift table and goods lift, slide, conveyer belt, are equipped, combined with forklifts, for moving goods from ground to upper floors.
| Classification | Strong Load Capacity Durable Steel Structure Platform Pallet Rack Supported Mezzanine Floor Platform |
| HS Code | 73089000 |
| Use | For storage purpose or as mezzanine office |
| Structure | Can be assembled and dismantled easily |
| Feature | Create new space |
| Solution | We provide with free safety design Autocad drawings |
| Loading Capacity | Up to 1000 kgs per square meter |
| Floors | 1~5 floors, customized |
| Floor Height | Every 50mm adjustable from bottom to top of uprights |
| Mezzanine Height | Up to 12000mm |
| Mezzanine Depth | 2000-100000mm |
| Mezzanine Width | 2000-100000mm |
| Beam Length | Up to 4000mm |
| Welding | Good welding by our skilled workers |
| Corrosion Protection | Lead free epoxy electrostatic powder coating |
| Colors | Blue, safety orange and computer grey or customized |
| Raw Steel Code | Q235B High Grade Hot Rolled Steel |
| Material Thickness | 1.5-6.0mm |
| Main Parts | Double upright column, beams, steel floorings or wood boards, loading gate, loading platform, stairs, handrails, base plates, bolts and nuts, etc. |
| Upright Frames | Omega Section 55*90mm / 65*90mm / 80*126mm |
| Beams | 80*50, 90*50, 100*50, 110*50, 120*50, 130*50, 140*50, 160*50mm |
| Flooring Types | Steel flooring or stamped steel flooring, perforated steel flooring, plywood, etc. |
| Free Accessories | Horizontal & diagonal bracings, base plates, safety locking pins, bolts & nuts and all necessary components. |
| Packing | Knockdown packing with air bubble film package, Neutral package or according to customer's requirements |
| Loading Port | Shenzhen, China |
| Lead Time | 20 working days |
| Installation Guide | We can send you installation instructions before shipment. |
| Warranty Time | Warranty: 3 years guarantee from the delivery date |
Including baseplates and anchor bolts for maximum structural stability.
Featuring a solid tubular construction with pin connectors for rigid connection.
Options include steel flooring, stamped steel flooring, perforated steel flooring, plywood, etc.
Equipped with standardized, safe access staircases and surrounding handrails.
Optional Components: The floorings can be steel flooring, stamped steel flooring, perforated steel flooring, or plywood, etc.
Standard Export Seaworthy Packing: Knockdown packing with plastic air bubble film package, save transportation cost, safe for long distance transportation.
Loading Port: Shenzhen Port of China (or Guangzhou Port of China)
Products package & loading for exporting:
Certifications:
Associated Brands:
Smooth surface mezzanine floor platform racking system for industrial storage
| Length (mm) | Depth (mm) | Height (mm) | Loading Capacity (kg/layer) | Number of Layers |
|---|---|---|---|---|
| ? | ? | ? | ? | ? |
| If not very sure of above info, please just let us know your storage needs. | ||||
Contact Information:
The platform can support heavy loads of up to 1,000 kg per square meter, depending on the engineering requirements and components used.
No. The platform is designed with a fully pre-manufactured assembly structure. It uses bolts and pin connectors, meaning no on-site cutting or welding is required, allowing easy relocation and modification.
We offer various flooring options to suit your needs, including flat steel flooring, stamped steel flooring, perforated steel panels, and plywood boards.
Yes, we provide free safety design AutoCAD layout drawings according to your warehouse height, space limitations, and target loading requirements.
The lead time is typically 20 working days. We provide a 3-year guarantee from the delivery date, along with complete installation instructions before dispatch.