Heavy Duty Flow rack Gravity Flow Q235 Steel Assembled Blue/Orange OEM Main Rack 1000-2000kg/pallet

Product Description

Warehouse Racking System
Industrial Racking Solutions
Custom Racking Options

Product Description

Gravity Flow Rack View 1
Gravity Flow Rack View 2
Gravity Flow Rack View 3

Specification

Layer 3-5
Material Q235 Steel
Type Flow Rack
Color Blue/Orange
Model Number HFR-01
Brand Name OEM
Feature Gravity Flow
Has wheel No
Hole Board Size N/A, customizable
Installation Assembled
Length of Layers Customized, customizable
Main sub rack form Main Rack
Main sub structure Bolted
Rack accessories Rollers, Brakes
Shelf thickness 2.0mm, customizable
Surface Treatment Powder Coating
Wire mesh No
Description Gravity pallet flow racking system.
Advantages FIFO, excellent stock rotation.
MOQ 1 system
Delivery Time 30 days
OEM/ODM Yes

Main Categories

Product Category Showcase
Supermarket Shelves
Storage Racking
Heavy Duty Storage Solutions
Category Overview

Company Profile

Company Facility Overview
Manufacturing Workshop
Production Line
Quality Management

Frequently Asked Questions (FAQ)

Q Does NEWTEK provide OEM, ODM, and custom manufacturing services?

Yes. NEWTEK provides OEM, ODM, and custom manufacturing services for warehouse racking, retail shelving, and metal fabrication products. Whether you have a complete technical drawing, a sample, or simply a product concept, our engineering team can help transform your ideas into manufacturable solutions and mass production products.

Q Can NEWTEK manufacture according to our drawings, specifications, or samples?

Absolutely. We regularly manufacture products based on customer drawings, technical specifications, samples, and project requirements. Our engineering team reviews every design to ensure manufacturability, structural integrity, and cost efficiency before production.

Q What information do you need to prepare an accurate quotation?

To provide an accurate quotation, we typically require product drawings, dimensions, load requirements, material specifications, quantities, destination country, and any special requirements. If drawings are unavailable, our engineering team can assist in developing a solution based on your concept or application needs.

Q What are your standard production lead times?

Standard production lead times typically range from 10–25 days after order confirmation, depending on product complexity, order volume, and project requirements. Large-scale projects are scheduled and managed to ensure on-time delivery.

Q What quality control procedures do you follow before shipment?

NEWTEK follows a strict 5-step quality control process covering raw materials, fabrication, welding, surface finishing, dimensional inspection, and final product verification before shipment to ensure consistent quality and compliance with customer specifications.

Q What after-sales support does NEWTEK provide after delivery?

We provide installation guidance, technical consultation, replacement part support, and ongoing engineering assistance to ensure the successful operation and long-term performance of our products.

Contact Us

Contact Us Banner

Related Products