Jracking Industrial Warehouse Storage Shelves Rack Durable Heavy Duty Cantilever Racks for Industrial Material Organization

Product Description

Cantilever Racking Overview
Industrial Racking Display
Name Cantilever Racking Material Q235B Steel
Size Customized Size Color Customized Color
Depth Customized Weight Capacity 1000kg/arm
Width Customized Height Customized
Finish Powder coating; Hot Dip Galvanized
Packing Export Package
Certification RMI/CE/ISO/TUV/AS4084-2012
MOQ One 20ft/40ft Container
Free Sample Available (Delivery Cost on Buyer)
OEM Available
Production Highlights
Step 1 Assembly

1 Connect 1 row of MK bracing brackets at the inside of columns positioned at ends, meanwhile connect 2 rows of brackets at both sides of columns in intermediate, as shown.

Step 2 Assembly

2 Position the column (1) vertically. Position the column (1) into the fixing MK base, as shown. Connect the column and the base with M20x40 bolts (7). Fastening the other M20x40 bolts (7) on the base. Recommended torque: 86~103N.M

Step 3 Assembly

3 The standard composition of the vertical bracing, after it has been fastened to the columns, is as shown in the illustration.

Step 4 Assembly

4 The bases must be leveled with metal leveling plates if necessary. Then, fully tighten the M20x40 bolts(7) on the base front as indicated in step 2. Using the drill-holes in the bases for fastening them to the floor use a 014 bit and drill a hole with a minimum depth of 100 mm. Remove the drilling remains and carefully hammer in the fastening M10x160 anchors(11). Firmly bolt the fastening plate in place. Recommended torque: 50 MN

Step 5 Assembly

5 The arm (12) is fastened to the column (1) using safety pins Φ29x140 (13). Fit the arms (11) according to the heights and distribution shown on the corresponding project drawing, where applicable.

Step 6 Assembly

6 Finally, the completed structure should look like the illustration.

Warehouse Installation Case
Factory Overview
Facility Equipment
Quality Standard Compliance
Product Categories Overview
Frequently Asked Questions (FAQ)
Q1 What are your standard trading and payment terms?

1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A are also available.

2) Lead time: Normally within 20-25 days after deposit received.

3) Sample policy: Samples are always available for each model and can be ready in 7-15 days once payment is received.

4) Shipping port: Shanghai / Nanjing, China.

5) Discounts: We offer volume-based discounts for large orders.

Q2 How can my goods be delivered?

1) Sea freight: We will update ocean freight costs once your destination seaport is confirmed.

2) Client-designated forwarder: Please provide the contact details of your shipping agent, and we will coordinate the cargo dispatch accordingly.

Q3 What services and customizations do you provide?

1) Inquiries related to products or pricing are answered within 12 hours.

2) Well-trained and experienced staff to address all inquiries in fluent English.

3) OEM & ODM capabilities to design and produce any customized racking required.

4) Experienced professional engineering team dedicated to providing optimized warehouse solutions.

Q4 What is the standard order and purchasing procedure?

Design drawing → Confirm drawing → Quotation → Proforma Invoice (PI) → Confirm PI → Arrange 30% deposit → Manufacture → QC inspection → Pay balance → Shipping.

Q5 What are your competitive advantages?

1) Payment flexibility: O/A 40-60 days available.

2) Production efficiency: Fast track delivery available for rush orders.

3) Factory pricing: Competitive direct-from-factory pricing structure.

4) Warranty assurance: Two-year warranty coverage; replacement parts supplied for any broken components.

Q6 Does Jracking have an MOQ policy and how are tooling fees handled?

MOQ: Jracking has no strict MOQ limitation; however, larger quantities ensure better pricing. We recommend ordering at least one 20ft container (approximately 15 tons) for regular products.

Tooling Fees: If new molds are required, tooling costs are charged before the initial production run and are eligible for partial or full refund once predetermined order volumes are met.

Related Products