Jracking Industrial Warehouse Rack Steel Heavy-Duty Cantilever Racking System For Car Storage

Product Description

Cantilever Racking Banner Cantilever Racking Overview
⚙Product Specifications
Name Cantilever Racking Material Q235B Steel
Size Customized Size Color Customized Color
Depth Customized Weight Capacity 1000kg/arm
Width Customized Height Customized
Finish Powder coating; Hot Dip Galvanized
Packing Export Package
Certification RMI/CE/ISO/TUV/AS4084-2012
MOQ One 20ft/40ft Container
Free Sample Available (Delivery Cost on Buyer)
OEM Available
👁Structural Overview
Racking Structure Diagram 1
Racking Structure Diagram 2
Racking Structure Diagram 3
Racking Structure Diagram 4
🔧Installation Procedures
Step 1 Installation
Step 1

Connect 1 row of MK bracing brackets at the inside of columns positioned at ends, meanwhile connect 2 rows of brackets at both sides of columns in intermediate, as shown.

Step 2 Installation
Step 2

Position the column (1) vertically. Position the column (1) into the fixing MK base, as shown. Connect the column and the base with M20x40 bolts (7). Fastening the other M20x40 bolts (7) on the base. Recommended torque: 86~103N.M

Step 3 Installation
Step 3

The standard composition of the vertical bracing, after it has been fastened to the columns, is as shown in the illustration.

Step 4 Installation
Step 4

The bases must be leveled with metal leveling plates if necessary. Then, fully tighten the M20x40 bolts(7) on the base front as indicated in step 2. Using the drill-holes in the bases for fastening them to the floor use a 014 bit and drill a hole with a minimum depth of 100 mm. Remove the drilling remains and carefully hammer in the fastening M10x160 anchors(11). Firmly bolt the fastening plate in place. Recommended torque: 50 MN

Step 5 Installation
Step 5

The arm (12) is fastened to the column(1) using safety pins Ø29x140(13). Fit the arms (11) according to the heights and distribution shown on the corresponding project drawing, where applicable.

Step 6 Installation
Step 6

Finally, the completed structure should look like the illustration.

📈Production & Quality Assurance
Quality Standards Certificates Factory Facility
Production Process 1
Production Process 2
Packing and Dispatch
Warehouse Storage Solution
Product Range Series
❓Frequently Asked Questions (FAQ)
What are your trading terms and payment options?

1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A are also available.

2) Lead time: Normally in 20-25 days after deposit received.

3) Sample policy: Samples are always available for each model. Samples can be ready in 7-15 days once payment received.

4) Shipping port: Shanghai / Nanjing, China.

5) Discounts: We offer attractive discounts for large volume orders.

How will my goods be delivered?

1) Sea freight: We will update shipping costs as soon as your designated destination sea port is confirmed.

2) Forwarder designated by client: Please provide contact details of your forwarder/shipping agent, and we will arrange the cargo handover accordingly.

What professional services do you provide?

1) Inquiries related to our products or pricing will be answered within 12 hours.

2) Well-trained and experienced staff to address all queries in fluent English.

3) Full OEM & ODM support; our team can design customized racking tailored to your facility.

4) Seasoned professional engineers dedicated to calculating and offering optimized storage solutions.

What is the standard procedure to purchase your products?

Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance → Shipping

What core advantages do you offer?

1) Payment: We can accommodate O/A terms for 40-60 days.

2) Lead time: Fast turnaround times available for urgent orders.

3) Factory price: Highly competitive direct factory-gate pricing.

4) Warranty: 2-year warranty with complimentary replacements for defective parts.

Do you have a Minimum Order Quantity (MOQ) limitation, and how are tooling fees handled?

MOQ: No strict limitation, but economies of scale apply. We recommend regular orders to match at least one 20ft container (approximately 15 tons).

Tooling Fees: For custom molds requiring tooling, fees are charged prior to opening the mold for the first batch and are partially or fully refunded once cumulative order volumes reach specific milestones.

Related Products