First in First Out Gravity Flow Lane Aluminum FIFO Rack Rail System for Warehouse Picking

Product Description

FIFO Monorail Track System

Product Description

FIFO Monorail Rail Details
FIFO Monorail Rails are simple, gravity-fed track systems used in warehouses for efficient "First-In, First-Out" (FIFO) stock rotation, guiding carts or dollies along a single rail to ensure older stock is used first, streamlining material flow and preventing obsolescence. These rails, often made of aluminum with steel running surfaces, feature grooves for mounting accessories and can be extended and anchored, simplifying logistics for handling items like rolls or containers.

Specification

Specification Dimension Scheme
Material Flow Designed for one-sided guide, allowing wheeled carts or dollies (for specific wheel widths like 40mm or 55mm) to move smoothly.
Gravity-Fed Items are loaded at the high end and roll down by gravity to the low end, naturally implementing FIFO.
Modular Design Rails come in sections (e.g., 1200mm, 2400mm) that connect with strips, allowing for customized lengths.
Versatile Mounting Can be anchored to the floor or integrated with posts using mounting sets, with slots for attaching signage, enclosures, or brakes.
Rail Component Details 1
Rail Component Details 2
Rail Section Showcase 1
Rail Section Showcase 2
Rail Section Showcase 3

Applications

Warehouse Logistics: Ideal for managing inventory that needs strict rotation, such as food, pharmaceuticals, or manufacturing components.
Workstation Setup: Used in assembly or picking stations to feed parts in sequence, reducing search time and improving efficiency.

Package and Delivery

Packaging and Shipping
Packaging: Wooden Case
Delivery Time: 7-15 days, within 30 days. (According to the quantity)

Company Introduction

Company Facility
With history of from the year of 2002, Sanhok group has 230+ employees in China (Among them, 47+ engineers are with 20+ years related industry experience, 23+ engineers are with 20+ years related industry experience). Sanhok branches are in Guangzhou, Dongguan, Foshan.
Its main products including conveyor, home appliances assembly line like tv assembly line, air conditioner assembly line, washing machine assembly line, mobile phone assembly line, led lamp assembly line etc, accessories like lean pipe joint system, convey roller, roller rail, aluminum, hollow plate, working table. It is mainly used in household appliance industry, lithium battery industry, warehousing and logistics industry, bathroom industry, electronic industry, LED lamp industry, catering industry, logistics equipment industry.
Sanhok products with huge quantity are selling to China and overseas including South East Asia, Middle East Europe, Africa, North America and South America. We sincerely hope that friends from all over the world will become our loyal partners and forge ahead.
Factory Overview 1
Factory Overview 2

Frequently Asked Questions

Q1: What are the materials used for this Product?
A: This product is mainly made of carbon steel or stainless steel, often configured with high-grade aluminum profiles and durable steel running surfaces to ensure long-term stability and smooth transport.
Q2: Where can this product be applied?
A: It can be widely applied in assembly lines, industrial warehouses, conveyor lines, logistics sorting zones, and lean manufacturing workstations across varied manufacturing industries.
Q3: How does the gravity-fed FIFO system function?
A: Items are loaded at the elevated end of the track and smoothly roll forward to the unloading point via gravity, naturally enforcing a First-In, First-Out sequence to avoid material expiration and obsolescence.
Q4: Can the length of the monorail tracks be customized?
A: Yes, the rails adopt a modular design provided in standard segments (such as 1200mm or 2400mm) that can be seamlessly interconnected with connecting strips to achieve any required system length.
Q5: What are the packaging and delivery timelines?
A: Products are secured inside sturdy export wooden cases. Standard delivery generally ranges from 7 to 15 days, with larger volume projects dispatched within 30 days depending on final quantities.

Related Products