High Capacity FIFO Dynamic Storage Solution Adjustable Roller Rails Corrosion Resistant Warehouse Shelves Carton Flow Rack

Product Description

Carton Flow Rack System Presentation
Carton Flow Rack Engineering Overview
Carton Flow Rack Overview

Carton flow rack is also called dynamic rack makes it efficiency to have the product flow though the stocking aisle to the picking aisle. Carton flow rack is a high density, dynamic storage systems that increase flexibility and maintain the First-In / First-Out product flow from the stocking aisle to the picking aisle increasing efficiency.

The items being stored are loaded in the rear and rolled down to the front where they are picked up. The inclined front offers optimum visibility and access to the containers, which allows easy retrieval of more bulky merchandise with short storage time.

The roller tracks are used in a number of combinations, depending on the carton sizes, the quality of the carton and the weight. The roller beds are developed to allow a maximum flexibility in the positioning of the tracks. The can be laid at a very small pitch.

Structural Features
➜
Automatic Sliding: Putting the goods on the wheel. One side for loading, the other side is for picking. Picking side of the rack is lower than loading side and the goods can automatically slide from loading side to picking.
✓
FIFO System: First in first our storage solutions.
⚙
High Efficiency: One time loading, several times picking, high storage efficiency.
★
Application Versatility: Suitable for shortdated storage and picking work of big quantities goods. Widely used in logistic center, assemble workshop and high turnover frequency warehouse.
⚖
Load Capacity: 100~2000kg/layer.
Product Specifications
Product Name Roller Shelf, Warehouse Roller Rack System, Gravity Flow Rack
Material Cold-rolled Steel Q235
Size Customized, Depend on what size you want
Color Customized (RAL SYSTEM)
Capacity 300-5000kg/layer (can be customized)
Surface Treatment Powder coated
Feature Anti-rust & Corrosion protection
Package Knock down packed by cartons with air bubble foam
Usage Warehouse Rack
Advantage Save space and Save labor cost
Lead Time 10-15 days
Shipping By sea
Payment L/C, T/T etc.
Product Display & Visuals
Frequently Asked Questions (FAQ)
QAre you a factory or trading company?
We are a factory. We specialize in all kinds of warehouse storage rack.
QWhere is your factory located? How can I visit there?
Our factory is located in Nanjing City, Jiangsu Province, China. You can fly to Nanjing airport directly. You are warmly welcome to visit us whenever available!
QWhat is the raw material of your products?
The raw material of steel code is Q235. Other steel is also available according to clients' requirements.
QWhat is the term of payment and delivery time?
TT, LC, and Western Union are available. In general, delivery is within 15 days after receiving the deposit.
QHow do you guarantee product quality and monitor order status?
We have professional engineers to calculate structural sizing to guarantee your load weight request. Before shipping, our QC inspects the quality thoroughly. Additionally, we will send updates and photos across different production stages to keep you informed.
QHow can I install the racks?
We provide detailed installation drawings to guide you through the process. If needed, we can also provide an engineer to assist with installation guidance (travel, accommodation, and meal expenses to be covered by the client).

Related Products