Custom roll-formed, heavy-duty racking assemblies optimized for European standard pallet dimensions (EUR 1: 1200x800mm, EUR 2: 1200x1000mm) and automated crane/VNA lift clearances.
When vertical storage exceeds 12 meters, structural dynamics shift from static localized loads to complex systemic deflection, second-order effects (P-Delta), and slab interaction.
In the Czech Republic, high bay racking installations are governed under stringent European standards. Cold-formed steel profiles must maintain exact yield tolerances (Q235B, Q355B equivalent to S235JR and S355JR under EN 10025). High bay installations reaching heights from 12 meters to over 40 meters demand critical calculation of horizontal seismic action, second-order sway, wind loading for clad-rack buildings (silová regálová konstrukce), and impact resistance at aisle junctions.
Our engineering division designs each high-bay upright profile with specialized moment-resistant beam-connector locks and continuous roll-formed columns without intermediate splice joints where dynamic stiffness is needed. Every frame assembly is subjected to FEM finite element analysis to ensure compliance with ČSN EN 15620 (Warehouse Tolerances and Clearances) and ČSN EN 15635 (Inspection and Maintenance).
The spine of Czech industry demands strict JIT (Just-In-Time) and JIS (Just-In-Sequence) supply lines. Our high bay selective and live flow pallet racks store heavy steel press components, transmission assemblies, and battery packs for EV platforms. Engineered for high cycling frequencies and seamless integration with tow-train retrieval systems.
Logistics real estate near Prague, Brno, and Plzeň handles massive throughput bound for Germany, Austria, and Poland. High bay VNA installations reach clearances beyond 15 meters to multiply warehouse volume within restricted land boundaries, slashing real estate acquisition costs per cubic meter.
Energy efficiency in refrigerated distribution centers depends on packing the highest number of pallet positions into insulated envelopes. We engineer high bay Drive-In and semi-automated Radio Shuttle racks that withstand sub-zero temperatures (-30°C) without brittle fracture, preserving conditioned volume.
Shifting economic fundamentals across the CEE region are accelerating capital transition toward high-density vertical storage infrastructure.
Prime logistics rents around Prague and the D1 hub have surged. High bay systems extending from 12m to 24m allow businesses to double or triple storage capacity on an identical building footprint, avoiding new land development.
With one of the lowest unemployment rates in the EU, Czech warehouse operators are rapidly implementing automated high-density shuttle systems and AS/RS cranes to run lights-out vertical operations with minimal operator overhead.
BREEAM and LEED-certified logistics parks demand reduced facility footprints. Compact high-bay warehouses require significantly less concrete slab, roofing, and perimeter insulation, lowering lifetime heating and operational emissions.
Global supply chain disruptions have prompted European enterprises to shift from strictly lean JIT models to localized buffer warehousing. Czech facilities now maintain 20-30% more strategic safety stock within their high-bay reserves.
Every structural component is fabricated within our standardized 30,000 m² manufacturing base under ISO 9001:2015 and CE certification protocols.
High-tensile certified structural steel coils tested for chemical composition and yield strength.
Computer-controlled continuous slitting lines delivering sub-millimeter strip tolerances.
High-speed CNC punch presses forming accurate teardrop and diamond upright patterns.
Gradual 24-station cold roll-forming lines preventing micro-stress fractures in heavy gauges.
Interlocking twin-C beam profiling delivering exceptional torsional rigidity under load.
Automated welding stations fusing beam end connectors with deep, uniform penetration seams.
Mechanical shot-blasting and surface profiling to eliminate scale, oil, and welding spatter.
Multi-tank chemical pretreatment creating a micro-crystalline iron phosphate corrosion barrier.
Automated powder spray booths followed by high-temperature curing ovens at 200°C.
CMM tolerance verification, thickness checks, and container-optimized heavy timber bundling.
Essential technical, regulatory, and logistics answers for warehouse directors, supply chain managers, and general contractors in the Czech Republic.
Send your building dimensions, clear height, pallet weights, and throughput requirements. Our engineering division will supply a complete CAD layout, 3D rendering, and structural load analysis free of charge within 48 hours.
Contact Us