| Product name | Steel structure warehouse/workshop |
| Main steel frame | H section steel beam, C section steel beam, Painted or galvanized Steel |
| Material | Q235B, Q355B |
| Bolt Accessories | Foundation bolt & High-Strength Bolts & General Bolt |
| Wall & Roof | EPS / Glass Wool / Rock Wool / PU Sandwich Panel Or Corrugated Steel Sheet |
| Door | Sliding Sandwich Panel Door / Rolling Metal Door |
| Window | Aluminium Alloy Window / PVC Window |
| Surface | Hot dip galvanized or painted |
| Other | Semi-transparent Skylight belts, Ventilators, Downpipe and Gutter |
Basic design requirements and design Load:
We will recommend the best design for the purpose of the building:
We can provide installation guide service based on customers' requests.
Salesman will confirm the time accordingly, large orders should communicate with the order management department in advance. Normally, delivery time is 30 days after receiving deposit. Large order delivery time should be arranged separately.
a. Quality of the design: Think about possible problems in advance and provide a high-quality design solution.
b. Quality of the raw material: Choose the qualified raw material.
c. Quality of the production: Precise manufacturing technique, experienced workers, strict quality inspection.
Under conventional climate and environment, the entire steel structure building is 10 years, main structure is 15 years, and the protecting system is 10 years.
Strong wind region: Improve the wind-resisting ability of the internal structure.
Cold region: Increase the thickness of the wall, or use good insulation material, improve the anti-pressure ability of the structure.
High corrosion region: Use corrosion resistant material, or paint anticorrosive coating.