China Factory Heavy Duty Cantilever Racks Steel Warehouse Cantilever Rack For Cold Room Storage System

Product Description

Cantilever Racking Banner
Cantilever Racking Structure
Product Specifications
Name Cantilever Racking Material Q235B Steel
Size Customized Size Color Customized Color
Depth Customized Weight Capacity 1000kg/arm
Width Customized Height Customized
Finish Powder coating; Hot Dip Galvanized
Packing Export Package
Certification RMI/CE/ISO/TUV/AS4084-2012
MOQ One 20ft/40ft Container
Free Sample Available (Delivery Cost on Buyer)
OEM Available
Detail 1
Detail 2
Detail 3
Detail 4
Installation Guide
Step 1
1. Connect 1 row of MK bracing brackets at the inside of columns positioned at ends, meanwhile connect 2 rows of brackets at both sides of columns in intermediate, as shown.
Step 2
2. Position the column (1) vertically. Position the column (1) into the fixing MK base, as shown. Connect the column and the base with M20x40 bolts (7). Fastening the other M20x40 bolts (7) on the base. Recommended torque: 86~103N.M
Step 3
3. The standard composition of the vertical bracing, after it has been fastened to the columns, is as shown in the illustration.
Step 4
4. The bases must be leveled with metal leveling plates if necessary. Then, fully tighten the M20x40 bolts (7) on the base front as indicated in step 2. Using the drill-holes in the bases for fastening them to the floor use a 014 bit and drill a hole with a minimum depth of 100 mm. Remove the drilling remains and carefully hammer in the fastening M10x160 anchors (11). Firmly bolt the fastening plate in place. Recommended torque: 50 MN
Step 5
5. The arm (12) is fastened to the column (1) using safety pins Ø29x140 (13). Fit the arms (11) according to the heights and distribution shown on the corresponding project drawing, where applicable.
Step 6
6. Finally, the completed structure should look like the illustration.
Product Gallery 1
Product Gallery 2
Product Gallery 3
Product Gallery 4
Product Gallery 5
Product Gallery 6
Product Gallery 7
Product Range
Frequently Asked Questions
Q What are your trading and payment terms?

1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A are also available.

2) Lead time: Normally within 20-25 days after deposit received.

3) Sample policy: Samples are available for each model. Samples can be ready in 7-15 days once payment received.

4) Shipping port: Shanghai / Nanjing, China.

5) Discounts: We offer volume discounts for large orders.

Q How can my goods be delivered?

1) Sea freight: We will provide shipping freight updates once your destination seaport is confirmed.

2) Client-designated forwarder: Simply provide the contact details of your shipping agent, and we will arrange the delivery logistics accordingly.

Q What services do you provide?

1) All inquiries regarding our products or pricing will be answered within 12 hours.

2) Well-trained and experienced staff to assist you in fluent English.

3) OEM & ODM customization services to help you design complete racking configurations.

4) Access to highly experienced engineers for tailor-made warehouse solutions.

Q What is the ordering process?

Design drawing → Confirm drawing → Quotation → Proforma Invoice (PI) → Confirm PI → Arrange 30% deposit → Manufacture → QC inspection → Pay balance → Shipping

Q What advantages do you offer?

1) Flexible Payment: We can offer O/A 40-60 days.

2) Rapid Lead Times: Fast-track dispatch available for rush orders.

3) Direct Factory Pricing: Competitive factory-direct rates.

4) Warranty: 2-year warranty with free replacement parts provided if broken.

Q What are the MOQ and tooling fee policies?

MOQ: There is no strict MOQ limitation, but larger orders receive better pricing. We recommend ordering at least one 20ft container (approx. 15 tons) for optimal freight cost.

Tooling Fee: If a new mold is required, tooling costs are charged upfront prior to initial production and are partially or fully refunded once order volumes meet agreed thresholds.

Related Products